Innisfil Beach Park Implementation Plan
Council approved the Innisfil Beach Park (IBP) Implementation Plan and Final Concept on March 24, 2023. The IBP Implementation Plan is the next step in moving forward with the design and construction of park improvements envisioned in the Innisfil Beach Park Master Plan 2020.
Initiated in the fall of 2020, the purpose of the IBP Implementation Plan was to:
- Complete environmental background studies
- Prepare five alternate park design concepts for community input that would ensure:
- Adequate servicing for future recreational facilities and amenities
- Improvement to traffic flow through the park for pedestrians, cyclists, and motorists
- Plan appropriate phasing of the park improvements
Final Concept
Based on the IBP Master Plan and public input, the Final Concept contains 49 projects phased over the next 20 years. The improvements include connections into the park that will ease traffic congestion, beach area enhancements, and new amenities in underutilized areas to maximize the use of the parkland and increase local park use during off-peak times.
Improvement phases |
The improvements are planned over three phases. |
Phase 1 - Proposed Design 2023/2024, Construction 2025/2026 |
|
Phase 2 - Proposed Design 2028/2029, Construction 2029/2030 |
*Requires relocation of baseball diamond offsite prior to construction |
Phase 3 - Proposed Design 2033/2034, Construction 2035/2036 |
|