Council approved the Innisfil Beach Park (IBP) Implementation Plan and Final Concept on March 24, 2023. The IBP Implementation Plan is the next step in moving forward with the design and construction of park improvements envisioned in the Innisfil Beach Park Master Plan 2020.

Initiated in the fall of 2020, the purpose of the IBP Implementation Plan was to:

  • Complete environmental background studies
  •  Prepare five alternate park design concepts for community input that would ensure:
    • Adequate servicing for future recreational facilities and amenities
    • Improvement to traffic flow through the park for pedestrians, cyclists, and motorists
  • Plan appropriate phasing of the park improvements

Final Concept

Based on the IBP Master Plan and public input, the Final Concept contains 49 projects phased over the next 20 years. The improvements include connections into the park that will ease traffic congestion, beach area enhancements, and new amenities in underutilized areas to maximize the use of the parkland and increase local park use during off-peak times.

Map showing Innisfil Beach Park Final Concept
Improvement phases
The improvements are planned over three phases. 
Phase 1 - Proposed Design 2023/2024, Construction 2025/2026 
  • Beach enhancements and new drop-off area
  • New winterized beach washroom facility
  • New toddler play area
  • Widened pedestrian bridges and culvert rehabilitation
  • New park exit at 25th Sideroad
  • Landscaping, drainage improvements, and planting of trees (to meet goal of 1000 additional trees)
Phase 2 - Proposed Design 2028/2029, Construction 2029/2030
  • New park entrance with roundabout*
  • New skate park*
  • New pump track*
  • New basketball courts*
  • New winterized washroom facility*
  • Dome existing tennis courts, redevelop courts to support pickleball, and add club house
  • New community garden
  • New dog park
  • Relocated motorized boat launch and short-term slips and dredging in Lake Simcoe to accommodate necessary depth for boats
  • Landscaping, drainage improvements, and planting of trees

*Requires relocation of baseball diamond offsite prior to construction

Phase 3 - Proposed Design 2033/2034, Construction 2035/2036
  • New event plaza with seasonal ice rink and splash pad
  • New restaurant and outdoor deck
  • New winterized washroom
  • New separate park entrance to boat launch
  • New non-motorized watercraft rental and rental dock
  • Completion of trail connections through all spaces
  • Landscaping, drainage improvements, and planting of trees