Timeline |
The project will be designed and constructed in four phases, splitting the corridor into nine segments. Timelines and phasing are based on the preliminary design and phasing plan, and may be subject to change. |
Phase 1 - Detailed Design 2023-2024, Construction 2025 |
Phase 1 covers a 1.4 km section of roadway from Big Bay Point Road to Mapleview Drive. The project consists of grading and restoration works, drainage improvements including bioswales integrated into the ditches, and a multi-use trail on the east side of the road. |
Phase 2 |
The project limits of Phase 2 are Mapleview Drive to 10th Line. |
Phase 3 |
The project limits of Phase 3 are 10th Line to north of William Street. |
Phase 4 |
The project limits of Phase 4 are north of William Street to Innisfil Beach Road. |
Background
In 2021, WSP Canada was retained to develop a preliminary design for the project, with a goal to enhance the safety and experience of all road users while expanding transportation options for Innisfil residents. After a thorough public consultation process, the preliminary design was completed in 2022. The design aligns with the Town’s vision to implement roadway improvements that accommodate growth while prioritizing active transportation, safety, and environmental sustainability.
Notices and reports
View the study notices and reports associated with the project:
- Notice of Study Commencement
- 25th Sideroad Preliminary Design Report
- Appendix A – Preliminary Design Drawings (Roll Plan and Bridge Cross Sections)
- Appendix C – Geotechnical Investigation and Pavement Design Report
- Appendix D – Arborist Report and Tree Preservation Plans
- Appendix E – Stormwater Management Report
- Appendix F – Alternatives Evaluation Matrix and Typical Sections of Alternatives
- Appendix G – Roundabout Alternatives and Analysis
- Appendix H – Engagement Report
- Appendix I – Roadway Design Criteria
- Appendix J – Roadway Safety Review
- Appendix K – Cost Estimate and Phasing Plan