7th Line - 20th Sideroad to Lake Simcoe
The Town of Innisfil has completed a Schedule 'C' Municipal Class Environmental Assessment (Class EA) to facilitate improvements to 7th Line from 20th Sideroad to Lake Simcoe.
Design and construction
The project has been awarded to Tatham Engineering Limited. The design of this project has now commenced, with property acquisition and utility relocation planned for 2025, and construction planned to begin in 2026 with an estimated completion date of fall 2027.
The design of 7th Line from 20th Sideroad to Lake Simcoe will be based on the preferred alternative from the Municipal Class Environmental Assessment Schedule 'C' that was completed in 2019. Improvements include:
- A safe and durable roadway with increased capacity
- New active transportation infrastructure (sidewalk and multi-use path)
- New traffic calming features, pedestrian crossings, and intersection improvements
- New streetscaping/landscaping features
- Water/wastewater servicing (dependent on the findings of InnServices Servicing Master Plan)
- Improvements to stormwater and drainage systems
- Realignment and natural heritage improvements to Banks Creek
Environmental Study Report
View the Environmental Study Report (ESR) that documents the Class EA study process, consultations, planning and recommended solutions:
Study notices
View the study notices and public open house details associated with the project: