7th Line Storm Drainage Outlet (Cross Street)

7th Line Storm Drainage Outlet

In 2007, the Town of Innisfil (the Town) completed a Class Environmental Assessment (EA) Study to consider alternatives to improve the drainage capacity of Watercourse No. 5 (Banks Creek) from St. Johns Road to Lake Simcoe. The recommended solution was to replace the existing culvert structure at Cross Street with a new concrete arch span structure to provide a reduction in flooding during more frequent storm events.


Below you will find the most updated EA and all documents associated with this project.

Environmental Assessment Notice: June 1, 2020

Notice of Filing Class Environmental Assessment Addendum : 7th Line Storm Drainage Outlet

Environmental Assessment Notice: November 15, 2019

Notice of Filing Class Environmental Assessment Addendum : 7th Line Storm Drainage Outlet

7th Line EA Summary Report 2007, by Ainley Group

7th-Line-EA-Summary-Report-2007

Related Documents

▪️ 7th Line Storm Drainage EA Addendum Appendix A

▪️7th Line Storm Drainage EA Addendum Appendix B

▪️ 7th Line Storm Drainage EA Addendum Appendix C

▪️ 7th Line Storm Drainage EA Addendum Appendix D

▪️ 7th Line Storm Drainage EA Addendum Appendix E

▪️ 7th Line Storm Drainage EA Addendum Appendix F

▪️ Storm Drainage EA Addendum RDS61

Project Contacts

Amber Leal, B.Sc., CET
Capital Project Manager
Town of Innisfil
2101 Innisfil Beach Road
Innisfil, ON
L9S 1A1 7
05-436-3740 x 3246
aleal@innisfil.ca

Andrea LaPlante, P.Eng.
Environmental Assessment Coordinator Associated Engineering (Ont.) Ltd.
Suite 200
165 Commerce Valley Drive West
Markham, ON
L3T 7V8 905-346-0990
laplantea@ae.ca