The Town of Innisfil has initiated a Class Environmental Assessment (EA) for a proposed interchange at 6th Line and Highway 400. The 6th Line Interchange project is being planned as Schedule C project under the Municipal Class Environmental Assessment (2007) process, as amended in 2011 and 2015. The EA Study will confirm project need and justification, document existing environmental conditions, examine alternatives and define the interchange design.

The EA will review the Town’s Transportation Master Plan to confirm it satisfies Phases 1 and 2 of the Municipal Class EA for a Schedule C study, and will complete Phases 3 and 4 of the Class EA  for the proposed interchange. The Municipal Class EA will engage the public in determining a recommended plan for improvements.

The first Public Open House was held on June 7, 2016 and the second Public Open House was held on December 6, 2016. The Environmental Study Report will be available at the Town Hall Customer Service Desk and the Lakeshore IdeaLAB and Library from January 31, 2017 to March 1, 2017 for public review and comment. 

Status

Environmental AssessmentEngineering DesignConstruction
Completed March 2017N/AN/A

Project Type: 

Roads Project

Managing Department: 

Engineering

Jessica Jenkins, P.Eng.
Project Manager
Town Of Innisfil
2101 Innisfil Beach Road
Innisfil, Ontario L9S 1A1
Tel: 705-436-3710 ext. 3224
Toll Free: 1-888-436-3710
jjenkins@innisfil.ca 

Steve Taylor, P. Eng.
Consultant Project Manager
BT Engineering
586 Eglinton Avenue East
Toronto, Ontario M4P 1P2
Tel: 1 (519) 672-2222
Toll Free: 1-855-228-4813
steven.taylor@bteng.ca