Search

Select a Date Range

Road work: Gilford Road

Posted on Friday, July 28, 2023 03:32 PM

Gilford Road from 20th Sideroad to Beach Road is being rehabilitated and widened. Work includes the installation of a multi-use pathway. 

Construction schedule

The Contractor (Georgian Paving) is scheduled to start on August 7, 2023. Road work is expected to be completed by November 3, 2023. Working hours are anticipated to be between 7 a.m. to 8 p.m. Some work on Saturdays may be required.

Public road access and traffic disruptions

Traffic disruptions may occur during construction. Driveway access...

Construction at the South Innisfil Arboretum

Posted on Tuesday, June 27, 2023 08:40 AM

South Innisfil Arboretum will be temporarily closed due to trail construction beginning July 4, 2023 at 8 a.m. The work is scheduled to be completed by the last week of July 2023, weather permitting.

What to expect

The Town is constructing a two-metre-wide limestone screenings trail at South Innisfil Arboretum and a two-metre-wide asphalt trail connecting the existing Nantyr Drive and Ralston Loop walkways. The trails will conform to AODA standards.

Approximate construction dates for each trail...

Town of Innisfil declares significant weather event

Posted on Wednesday, February 22, 2023 12:00 PM

The declaration of a Significant Weather Event ended on February 24, 2023 at 11:27 a.m.

Innisfil, ON – The Town of Innisfil is declaring a Significant Weather Event in response to expected inclement weather that may result in heavy snow accumulation and icy road conditions. The declaration will remain in effect until further notice.

The forecast provided by Environment and Climate Change Canada warns drivers that travel is anticipated to be hazardous due to reduced visibility and rapidly...

Lockhart Road Reconstruction and Servicing Update

Posted on Monday, July 25, 2022 12:34 PM

The contractor will return to pave the top coat of asphalt on Lockhart Road from 20th Sideroad to 25th Sideroad during the week of August 2, 2022, weather dependent. Once the paving is done, the contractor will complete any outstanding work such as driveway tie-ins, shouldering and line painting.

We expect this work to be done by the end of August 2022.

Public road access and traffic disruptions

Here's what residents can expect during construction: 

  • Traffic disruptions
  • One lane closures with traffic...

Boil water advisory in effect for Cookstown

Posted on Monday, June 20, 2022 09:10 PM

Update: The Boil Water Advisory issued for Cookstown on June 20, 2022 has been lifted by the Simcoe Muskoka District Health Unit. Laboratory test results have confirmed that the water is free from contamination and is safe to drink. Read more information

Innisfil, Ontario – Due to a watermain break near 4161 Highway 89 in Cookstown, residents within an affected area are being advised to boil their water. This is a precautionary measure while InnServices Utilities Inc. conducts repairs and...