Background

The Town of Innisfil has completed a Transportation Master Plan (TMP) Study to provide an update to the TMP Study completed in 2013. The study identifies a long-term plan that will guide the Town towards a future transportation network that meets the Inspiring Innisfil 2020 vision to grow, connect, and sustain, building on Provincial plans, County of Simcoe plans, and Our Place, the Innisfil Official Plan (January 2018).
The Innisfil TMP was conducted in accordance with the master planning process following the requirements of Phases 1 and 2 of the Municipal Class Environmental Assessment (EA) planning process, which is an approved process under the Ontario Environmental Assessment Act. The TMP addresses needs and justification at a broad level and recommended infrastructure projects will require further detailed studies as per the Municipal Class EA process.
The TMP identifies the infrastructure and policies needed to support growth in the Town to the year 2041 and provides a balanced transportation network that improves choices for residents in the community with a focus on cycling, walking, and transit. Short term, medium term, and long term improvements have been identified to achieve the recommend plan as part of this balanced strategy.
Status
Council adopted the TMP on May 9th, 2018Project Type:
Roads Project
If you require additional information or would like to be included on the project contact list, please contact one of the individuals below:
Amber Leal, BSc., C.E.T Project Manager Town of Innisfil 2101 Innisfil Beach Rd. Innisfil, ON L9S 1A1 Phone: 705-436-3740 ext. 3246 1-888-436-3710 (toll free) aleal@innisfil.ca | Jonathan Chai, P. Eng. Consultant Project Manager HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 Tel: 289-695-4629 jonathan.chai@hdrinc.com |
Transportation Master Plan Notice of Completion
Transportation Master Plan Update 2018 Final Report
Appendix E – Detailed Active Transportation Improvement Locations
Appendix F – 2013 TMP Recommendations
Background:
Transportation Master Plan Update 2017 Notice of Commencement
Transportation Master Plan Presentation from Public Open House 1
Transportation Master Plan Notice for Public Open House 2
Transportation Master Plan Presentation from Public Open House 2